Project:
N524JL/N87JL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (206)
Research
- (2)
Workshop
- (7)
Empennage
- (51)
Wings
- (57)
-
Push pull tubes...
-
Push pull tubes
-
Flap hinge work and...
-
Ailerons and flaps...
-
Weld aileron rods
-
Flaps started
-
Ailerons complete
-
Drilled/dimpled...
-
Riveting the ailerons
-
Begin ailerons
-
Roll Servo mount
-
Aileron brackets...
-
Pitot mast&tube...
-
Placed right wing in...
-
Left wing complete(ish)
-
Right wing begins
-
Left aileron&...
-
Right tank finished...
-
Left tank leak...
-
Left tank complete
-
Fuel tanks start of...
-
Countersink...
-
Left leading edge...
-
Upgraded rudder...
-
Repeat for the right...
-
Fuel flange and drain
-
Tank access panel
-
Tank attach brackets
-
Tank/ baffle...
-
Stiffeners&Z...
-
Tank...
-
Fuel tank mock up/fit
-
Leading edge cradle...
-
Wing jig built /...
-
Conduit supports...
-
Main ribs riveted
-
Wing wire conduit fab
-
Ribs complete
-
Uggghhhhhhhh
-
THE RIBS
-
Aileron spars complete
-
Spar doublers...
-
Aileron spar...
-
Finish tie down and...
-
Tie down bracket cont'd
-
Tie down fabrication
-
K1000-4 platenuts...
-
Countersink/prime/ac...
-
Tank attach nut plates
-
Inventory…...
-
WINGS ARE HERE!
-
Countersinking tips...
-
Wing tip continued work
-
Started making...
-
Zip Tips arrived!!
-
Email from Damien at...
-
Wings ordered
Fuselage
- (64)
Canopy
- (1)
Controls
Firewall Forewar
Engine/Cowling
- (2)
Fuel System
Propeller
- (1)
Instrument Panel
- (6)
Avionics
- (5)
Lighting
Landing Gear
Interior Finish
Paint / Decals
Inspection
Tools
- (7)
-
Rivet the left...
-
Avionic tools in...
-
Longeron yoke
-
Die and bit holder
-
More tools purchased
-
Bought a 29 gallon...
-
Cleveland Tools...
Practice
- (2)
Service B’s
- (1)
Builder Name:
Jeremy Leonard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1074
Total Flight Time:
Start/Last Date:
Mar 17, 2021 - No Finish Date
Engine:
Lycoming IO360M1B
Propeller:
Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:
Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
Friendly URL:
https://eaabuilderslog.org?s=N524JL/N87JL
Home or Last Project Picture
Feb 16, 2023
Riveting the ailerons
- (5 hours)
Category: Wings
Riveted the stiffeners to the skins. Simple and lovely back rivet process. The brackets were drilled for the an3-4 bolts that will attach them to the spar. The skins were also bent in the break I made for the elevators way back during the emmpenage. Used the same I think it was an 1/8” dowel to get the correct bend radius. This worked out great and had it without pillowing.
C02C4313-4B27-42B0-8552-D7200A09EA41.jpeg
D0B375DA-6170-426A-BC80-97A1CAB70867.jpeg
77EA83D8-67E9-4763-9095-8E03D3E0B051.jpeg
77B5D476-9859-4A8B-AF8C-5AFEAB3FF8E6.jpeg
D2308FFB-6C56-4386-BEA0-213C45829691.jpeg
B68F2D51-10BE-482A-BFCF-46D0D4540A8B.jpeg
42B6CFE6-35F1-4883-ABD1-1B2597685C78.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the